IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0039 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $36,367 $39,000 Implemented
NL0039 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $15,324 $44 Implemented
NL0039 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,128 $2,497 Implemented
NL0039 # 04 Y:2019 04 2019 MINIMIZE WATER USAGE $10,832 $1,127 Implemented
NL0039 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,739 $1,600 Implemented
NL0037 # 01 Y:2019 01 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $59,550 $111,550 Not Implemented
NL0037 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,092 $690 Not Implemented
NL0037 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,899 $2,807 Not Implemented
NL0037 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130 $46 Not Implemented
NL0038 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,358 $20,000 Not Implemented
NL0038 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,352 $25,229 Not Implemented
NL0038 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,806 $4,500 Not Implemented
NL0038 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,391 $31,162 Not Implemented
NL0034 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,764 $8,337 Implemented
NL0034 # 02 Y:2019 02 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,862 $11,390 Not Implemented
NL0034 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,679 $4,388 Not Implemented
NL0034 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $493 $0 Not Implemented
NL0034 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $248 $0 Not Implemented
NL0034 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $238 $500 Implemented
NL0034 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $275 Implemented
NL0033 # 01 Y:2019 01 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $39,609 $71,240 Implemented
NL0033 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,635 $42,417 Not Implemented
NL0033 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $919 $1,000 Implemented
NL0033 # 04 Y:2019 04 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $539 $100 Not Implemented
NL0032 # 01 Y:2019 01 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,146 $40,000 Not Implemented