Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,443
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0039 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $36,367 | $39,000 | Implemented |
NL0039 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $15,324 | $44 | Implemented |
NL0039 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,128 | $2,497 | Implemented |
NL0039 # 04 Y:2019 | 04 | 2019 | MINIMIZE WATER USAGE | $10,832 | $1,127 | Implemented |
NL0039 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,739 | $1,600 | Implemented |
NL0037 # 01 Y:2019 | 01 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $59,550 | $111,550 | Not Implemented |
NL0037 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,092 | $690 | Not Implemented |
NL0037 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,899 | $2,807 | Not Implemented |
NL0037 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $46 | Not Implemented |
NL0038 # 01 Y:2019 | 01 | 2019 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,358 | $20,000 | Not Implemented |
NL0038 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,352 | $25,229 | Not Implemented |
NL0038 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,806 | $4,500 | Not Implemented |
NL0038 # 04 Y:2019 | 04 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,391 | $31,162 | Not Implemented |
NL0034 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,764 | $8,337 | Implemented |
NL0034 # 02 Y:2019 | 02 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,862 | $11,390 | Not Implemented |
NL0034 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $1,679 | $4,388 | Not Implemented |
NL0034 # 04 Y:2019 | 04 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $493 | $0 | Not Implemented |
NL0034 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $248 | $0 | Not Implemented |
NL0034 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $238 | $500 | Implemented |
NL0034 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $275 | Implemented |
NL0033 # 01 Y:2019 | 01 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $39,609 | $71,240 | Implemented |
NL0033 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,635 | $42,417 | Not Implemented |
NL0033 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $919 | $1,000 | Implemented |
NL0033 # 04 Y:2019 | 04 | 2019 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $539 | $100 | Not Implemented |
NL0032 # 01 Y:2019 | 01 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $31,146 | $40,000 | Not Implemented |