IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0486 # 06 Y:1996 06 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $203 $757 Implemented
OK0486 # 07 Y:1996 07 1996 TREAT AND REUSE RINSE WATERS $17,249 $0 Not Implemented
OK0483 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $51,060 $0 Not Implemented
OK0483 # 02 Y:1996 02 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,400 $0 Implemented
OK0483 # 03 Y:1996 03 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,740 $5,400 Implemented
OK0479 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $31,839 $70,726 Not Implemented
OK0479 # 02 Y:1995 02 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $26,671 $25,000 Not Implemented
OK0479 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,121 $2,948 Implemented
OK0479 # 04 Y:1995 04 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,868 $3,950 Implemented
OK0479 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $1,266 $528 Implemented
OK0479 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,078 $11,000 Implemented
OK0479 # 07 Y:1995 07 1995 REDUCE SCRAP PRODUCTION $25,650 $0 Implemented
OK0480 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,052 $13,165 Not Implemented
OK0480 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,521 $0 Implemented
OK0480 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $1,384 Implemented
OK0480 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $792 Not Implemented
OK0480 # 05 Y:1995 05 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $135,200 $0 Implemented
OK0478 # 01 Y:1995 01 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $63,653 $25,000 Implemented
OK0478 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,374 $48,000 Implemented
OK0478 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,482 $2,520 Not Implemented
OK0478 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,490 $2,500 Not Implemented
OK0478 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $2,792 $160 Not Implemented
OK0478 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,382 $1,650 Not Implemented
OK0478 # 07 Y:1995 07 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,143 $1,000 Not Implemented
OK0478 # 08 Y:1995 08 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,578 $1,000 Implemented