IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0286 # 13 Y:1997 13 1997 INSTALL OCCUPANCY SENSORS $575 $450 Not Implemented
WI0286 # 14 Y:1997 14 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $527 $328 Not Implemented
WI0285 # 01 Y:1996 01 1996 REDUCE VENTILATION AIR $210,013 $64,100 Not Implemented
WI0285 # 02 Y:1996 02 1996 INCREASE USE OF AUTOMATION $60,000 $140,000 Not Implemented
WI0285 # 03 Y:1996 03 1996 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,786 $0 Implemented
WI0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,042 $3,100 Not Implemented
WI0285 # 05 Y:1996 05 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,605 $8,500 Not Implemented
WI0285 # 06 Y:1996 06 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,549 $10,500 Not Implemented
WI0285 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,680 $1,216 Not Implemented
WI0285 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,347 $2,521 Not Implemented
WI0285 # 09 Y:1996 09 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100 $0 Not Implemented
WI0285 # 10 Y:1996 10 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $380 $500 Not Implemented
WI0279 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $18,544 $3,400 Not Implemented
WI0279 # 02 Y:1996 02 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $12,559 $30,000 Not Implemented
WI0279 # 03 Y:1996 03 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,523 $0 Not Implemented
WI0279 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,862 $27,740 Implemented
WI0279 # 05 Y:1996 05 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,439 $1,000 Not Implemented
WI0279 # 06 Y:1996 06 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,075 $0 Implemented
WI0279 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,216 $1,779 Implemented
WI0279 # 08 Y:1996 08 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,917 $9,000 Not Implemented
WI0279 # 09 Y:1996 09 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,700 $0 Not Implemented
WI0279 # 10 Y:1996 10 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,744 $15,000 Not Implemented
WI0279 # 11 Y:1996 11 1996 REDUCE VENTILATION AIR $351 $500 Implemented
WI0284 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,453 $0 Not Implemented
WI0284 # 02 Y:1996 02 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,988 $14,280 Implemented