IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0215 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $93 $100 Implemented
NC0215 # 05 Y:2001 05 2001 USE ULTRASONIC CLEANING $19,642 $5,000 Not Implemented
NC0215 # 06 Y:2001 06 2001 $240,000 $270,000 Not Implemented
LE0109 # 01 Y:2001 01 2001 USE SYNTHETIC LUBRICANT $1,868 $200 Implemented
LE0109 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,400 $0 Implemented
LE0109 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,978 $2,500 Not Implemented
LE0109 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,570 $500 Implemented
LE0109 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,090 $1,000 Not Implemented
LE0109 # 06 Y:2001 06 2001 INSTALL STEAM TRAP $1,932 $1,000 Implemented
LE0109 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $303 $610 Implemented
LE0109 # 08 Y:2001 08 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $753 $2,700 Not Implemented
GT0712 # 01 Y:2001 01 2001 USE MINIMUM STEAM OPERATING PRESSURE $50,880 $75,000 n/a
GT0712 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,320 $55,800 n/a
GT0712 # 03 Y:2001 03 2001 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $17,930 $14,400 n/a
GT0712 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $10,878 $5,050 n/a
GT0712 # 05 Y:2001 05 2001 INSTALL SOLID WASTE INCINERATOR FOR HEAT $1,166,246 $1,875,000 n/a
GT0712 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $152,112 $51,570 n/a
GT0712 # 07 Y:2001 07 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $101,860 $27,240 n/a
GT0712 # 08 Y:2001 08 2001 HEAT OIL TO PROPER TEMPERATURE FOR GOOD ATOMIZATION $154,042 $7,500 n/a
BD0188 # 01 Y:2001 01 2001 USE RADIANT HEATER FOR SPOT HEATING $19,999 $78,750 n/a
BD0188 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,751 $3,000 Not Implemented
BD0188 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,505 $2,025 Not Implemented
BD0188 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $167 $253 Not Implemented
BD0188 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $0 Not Implemented
BD0188 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $500 Not Implemented