IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0367 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $328 $100 Not Implemented
BD0367 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,367 $2,000 Not Implemented
BD0367 # 06 Y:2010 06 2010 USE SYNTHETIC LUBRICANT $10,513 $1,000 Not Implemented
BD0367 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,960 $0 Not Implemented
BD0367 # 08 Y:2010 08 2010 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,366 $10,000 Not Implemented
BD0367 # 09 Y:2010 09 2010 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,942 $8,000 Not Implemented
BD0367 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,935 $8,000 Not Implemented
BD0367 # 11 Y:2010 11 2010 INSULATE BARE EQUIPMENT $7,420 $3,130 Not Implemented
BD0367 # 12 Y:2010 12 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,145 $3,600 Not Implemented
BD0367 # 13 Y:2010 13 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,993 $39,800 Not Implemented
BD0367 # 14 Y:2010 14 2010 MINIMIZE WATER USAGE $1,884 $3,920 Not Implemented
UA0041 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,100 $119,700 Implemented
UA0041 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $2,630 $380 Not Implemented
UA0041 # 03 Y:2010 03 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,320 $2,520 Implemented
UA0041 # 04 Y:2010 04 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $216,130 $0 Implemented
UA0041 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $76,495 $0 Implemented
UA0041 # 06 Y:2010 06 2010 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $21,020 $19,015 Not Implemented
UA0041 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,020 $2,450 Implemented
UA0041 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $2 Implemented
UA0041 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,310 $22,000 Not Implemented
UA0041 # 10 Y:2010 10 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,050 $7 Not Implemented
UA0041 # 11 Y:2010 11 2010 INSTALL TIMERS AND/OR THERMOSTATS $5,765 $675 Implemented
UM0360 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,778 $1,000 Not Implemented
UM0360 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,841 $24,120 Not Implemented
UM0360 # 03 Y:2010 03 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,348 $8,750 Not Implemented