IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0360 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $14,135 $31,924 Not Implemented
UM0360 # 05 Y:2010 05 2010 OPTIMIZE PLANT POWER FACTOR $6,734 $14,340 Not Implemented
UM0360 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,240 $200 Not Implemented
UM0360 # 07 Y:2010 07 2010 USE RADIANT HEATER FOR SPOT HEATING $45,305 $14,000 Not Implemented
UM0360 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,583 $2,000 Not Implemented
UM0360 # 09 Y:2010 09 2010 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $6,913 $2,000 Not Implemented
CO0631 # 01 Y:2010 01 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,000 $19,665 Implemented
CO0631 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,360 $3,977 Implemented
CO0631 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,020 $5,662 Implemented
CO0631 # 04 Y:2010 04 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $1,920 $27,104 Implemented
CO0631 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,710 $8,757 Implemented
CO0631 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $37,620 Implemented
CO0631 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $3,108 Implemented
SU0287 # 01 Y:2010 01 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,962 $0 Implemented
SU0287 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,424 $0 Implemented
SU0287 # 03 Y:2010 03 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,705 $0 Implemented
SU0287 # 04 Y:2010 04 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,358 $0 Not Implemented
SU0287 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $338 Implemented
SU0287 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,701 $1,174 Implemented
SU0287 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $162 $77 Not Implemented
SU0287 # 08 Y:2010 08 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $48,463 $70,000 Not Implemented
SU0287 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $253 $641 Not Implemented
OR0554 # 01 Y:2010 01 2010 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $33,705 $0 Implemented
OR0554 # 02 Y:2010 02 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,667 $700 Not Implemented
OR0554 # 03 Y:2010 03 2010 UPGRADE CONTROLS ON COMPRESSORS $13,900 $1,500 Implemented