IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0580 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $12,485 $850 Implemented
OR0580 # 02 Y:2012 02 2012 ELIMINATE/REDUCE AN OPERATION $3,906 $14,500 Implemented
OR0580 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $438 $555 Implemented
OR0580 # 04 Y:2012 04 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $1,969 $29,164 Not Implemented
OR0579 # 01 Y:2012 01 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,066 $0 Implemented
OR0579 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125,819 $198,800 Not Implemented
OR0579 # 03 Y:2012 03 2012 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $23,346 $55,000 Implemented
OR0579 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,300 $8,200 Not Implemented
OR0579 # 05 Y:2012 05 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,281 $12,000 Not Implemented
OR0579 # 06 Y:2012 06 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,805 $18,596 Not Implemented
OR0579 # 07 Y:2012 07 2012 USE PHOTOCELL CONTROLS $17,340 $46,680 Implemented
MA0689 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $85,000 $250,000 Implemented
MA0689 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,036 $4,000 Not Implemented
MA0689 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,784 $5,000 Implemented
MA0689 # 04 Y:2012 04 2012 USE OPTIMUM TEMPERATURE $13,757 $8,000 Implemented
MA0689 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,785 $3,000 Implemented
MA0689 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,905 $12,000 Not Implemented
MA0689 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,677 $9,750 Implemented
MA0689 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,958 $9,500 Not Implemented
MA0689 # 09 Y:2012 09 2012 USE OPTIMUM TEMPERATURE $5,818 $900 Implemented
MA0689 # 10 Y:2012 10 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,139 $5,200 Implemented
MA0689 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,144 $1,000 Implemented
MA0689 # 12 Y:2012 12 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,245 $1,500 Implemented
MA0689 # 13 Y:2012 13 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,032 $700 Implemented
MA0689 # 14 Y:2012 14 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,657 $6,000 Not Implemented