IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0750 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,128 $0 Not Implemented
OR0750 # 03 Y:2022 03 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,591 $4,338 Not Implemented
OR0750 # 04 Y:2022 04 2022 INCREASE USE OF AUTOMATION $149,543 $65,909 Not Implemented
OR0750 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $87,087 $87,086 Not Implemented
OR0750 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $49,792 $155,954 Not Implemented
CC0001 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $42,438 $42,308 n/a
CC0001 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $3,092 $0 n/a
CC0001 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $26,528 $0 n/a
CC0001 # 04 Y:2022 04 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,732 $10,000 n/a
CC0001 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $601 $0 n/a
CC0001 # 06 Y:2022 06 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $84 $180 n/a
MA0831 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $247,461 $2,531,558 Not Implemented
MA0831 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,697 $25,920 Not Implemented
MA0831 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,489 $9,040 Implemented
MA0831 # 04 Y:2022 04 2022 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $42,140 $270,000 Not Implemented
MA0831 # 05 Y:2022 05 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,831 $1,000 Implemented
MA0831 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,808 $21,525 Not Implemented
MA0831 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,657 $42,058 Implemented
MA0831 # 08 Y:2022 08 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,654 $15,630 Not Implemented
MA0831 # 09 Y:2022 09 2022 INSULATE FEEDWATER TANK $798 $1,376 Implemented
WM0174 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,961 $8,440 Not Implemented
WM0174 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,050 $8,821 Implemented
WM0174 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,934 $1,200 Not Implemented
WM0174 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $0 Implemented
WM0174 # 05 Y:2022 05 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,794 $0 Not Implemented