IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0542 # 01 Y:1994 01 1994 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,525 $1,200 Implemented
GT0542 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,210 $780 Implemented
GT0542 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $50 Implemented
GT0542 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,760 $24,565 Implemented
GT0542 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $335 $200 Implemented
GT0545 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $25,370 $0 Implemented
GT0545 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,800 $14,340 Implemented
GT0545 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,480 $3,780 Implemented
GT0545 # 04 Y:1994 04 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $923 $3,100 Not Implemented
GT0545 # 05 Y:1994 05 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,400 $12,000 Implemented
GT0543 # 02 Y:1994 02 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $10,138 $3,400 Implemented
GT0543 # 03 Y:1994 03 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,530 $7,185 Not Implemented
GT0543 # 04 Y:1994 04 1994 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,880 $8,250 Implemented
GT0543 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,940 $5,000 Implemented
GT0543 # 06 Y:1994 06 1994 USE COMPRESSOR AIR FILTERS $815 $750 Implemented
GT0544 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,820 $20,170 Implemented
GT0544 # 02 Y:1994 02 1994 REPAIR AND ELIMINATE STEAM LEAKS $5,240 $800 Implemented
GT0544 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $77,700 $212,000 Not Implemented
GT0544 # 04 Y:1994 04 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $18,160 $13,550 Implemented
GT0544 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $3,090 $2,665 Not Implemented
GT0544 # 06 Y:1994 06 1994 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $8,610 $13,750 Not Implemented
GT0544 # 07 Y:1994 07 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,905 $4,800 Not Implemented
GT0543 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,750 $14,450 Not Implemented
GT0541 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $66,555 $85,000 Implemented
GT0541 # 02 Y:1994 02 1994 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $31,280 $94,500 Implemented