IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0224 # 02 Y:2005 02 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $35,540 $80,000 Not Implemented
LE0224 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $49,379 $10,700 Not Implemented
LE0224 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $28,953 $4,000 Not Implemented
LE0224 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $20,478 $22,000 Not Implemented
LE0224 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,329 $1,500 Not Implemented
LE0224 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,035 $300 Not Implemented
LE0224 # 08 Y:2005 08 2005 REDESIGN PROCESS $8,369 $500 Not Implemented
LE0224 # 09 Y:2005 09 2005 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $13,539 $12,000 Not Implemented
LE0224 # 10 Y:2005 10 2005 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,055 $520 Not Implemented
LE0218 # 01 Y:2005 01 2005 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $39,290 $600 Not Implemented
LE0218 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,740 $3,000 Not Implemented
LE0218 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,249 $1,250 Not Implemented
LE0218 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,565 $480 Not Implemented
LE0218 # 05 Y:2005 05 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,530 $480 Not Implemented
LE0218 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,200 Not Implemented
LE0225 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $28,200 $2,000 Not Implemented
LE0225 # 02 Y:2005 02 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $17,500 $50,000 Implemented
LE0225 # 03 Y:2005 03 2005 INSTALL TIMERS AND/OR THERMOSTATS $11,161 $2,800 Not Implemented
LE0225 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,707 $200 Implemented
LE0225 # 05 Y:2005 05 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,158 $800 Not Implemented
LE0225 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $100 Implemented
LE0225 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,914 $2,500 Implemented
LE0225 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,118 $350 Not Implemented
LE0225 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,090 $35,595 Implemented
SU0221 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,043 $0 Implemented