Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,801
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0242 # 09 Y:2006 | 09 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $126 | $632 | Implemented |
SU0242 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $67 | $432 | Not Implemented |
WV0347 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $255,013 | $57,159 | Implemented |
WV0347 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $32,512 | $24,300 | Not Implemented |
WV0347 # 03 Y:2006 | 03 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,796 | $1,000 | Implemented |
WV0347 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $10,908 | $504 | Implemented |
WV0347 # 05 Y:2006 | 05 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,012 | $13,815 | Not Implemented |
WV0347 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,834 | $250 | Not Implemented |
WV0347 # 07 Y:2006 | 07 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,696 | $10,600 | Not Implemented |
WV0347 # 08 Y:2006 | 08 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $5,557 | $2,790 | Implemented |
WV0347 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,051 | $65 | Implemented |
WV0347 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $915 | $245 | Not Implemented |
WV0347 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $457 | $158 | Not Implemented |
LE0244 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,350 | $1,000 | Implemented |
LE0244 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,690 | $1,000 | Implemented |
LE0244 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,950 | $1,024 | Implemented |
LE0244 # 04 Y:2006 | 04 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $13,305 | $42,000 | Implemented |
LE0244 # 05 Y:2006 | 05 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,705 | $50 | Not Implemented |
LE0244 # 06 Y:2006 | 06 | 2006 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,252 | $50 | Implemented |
LE0244 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $4,751 | $450 | Implemented |
LE0244 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $61,139 | $68,713 | Implemented |
LE0241 # 01 Y:2006 | 01 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $306,494 | $200,000 | Not Implemented |
LE0241 # 02 Y:2006 | 02 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $61,625 | $80,000 | Not Implemented |
LE0241 # 03 Y:2006 | 03 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $47,697 | $40,000 | Not Implemented |
LE0241 # 04 Y:2006 | 04 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $24,673 | $12,500 | Not Implemented |