Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,119
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0286 # 03 Y:1997 | 03 | 1997 | USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS | $2,999 | $1,000 | Not Implemented |
WI0286 # 04 Y:1997 | 04 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,138 | $5,000 | Not Implemented |
WI0286 # 05 Y:1997 | 05 | 1997 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $26,499 | $0 | Not Implemented |
WI0286 # 06 Y:1997 | 06 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $19,520 | $88,000 | Not Implemented |
WI0286 # 07 Y:1997 | 07 | 1997 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,085 | $15,000 | Not Implemented |
WI0286 # 08 Y:1997 | 08 | 1997 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,230 | $10,230 | Not Implemented |
WI0286 # 09 Y:1997 | 09 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $18,978 | $3,600 | Not Implemented |
WI0286 # 10 Y:1997 | 10 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,310 | $210 | Not Implemented |
WI0286 # 11 Y:1997 | 11 | 1997 | MINIMIZE WATER USAGE | $274 | $0 | Not Implemented |
WI0286 # 12 Y:1997 | 12 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $953 | $0 | Not Implemented |
WI0286 # 13 Y:1997 | 13 | 1997 | INSTALL OCCUPANCY SENSORS | $575 | $450 | Not Implemented |
WI0286 # 14 Y:1997 | 14 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $527 | $328 | Not Implemented |
WI0285 # 01 Y:1996 | 01 | 1996 | REDUCE VENTILATION AIR | $210,013 | $64,100 | Not Implemented |
WI0285 # 02 Y:1996 | 02 | 1996 | INCREASE USE OF AUTOMATION | $60,000 | $140,000 | Not Implemented |
WI0285 # 03 Y:1996 | 03 | 1996 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,786 | $0 | Implemented |
WI0285 # 04 Y:1996 | 04 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,042 | $3,100 | Not Implemented |
WI0285 # 05 Y:1996 | 05 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,605 | $8,500 | Not Implemented |
WI0285 # 06 Y:1996 | 06 | 1996 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,549 | $10,500 | Not Implemented |
WI0285 # 07 Y:1996 | 07 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,680 | $1,216 | Not Implemented |
WI0285 # 08 Y:1996 | 08 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $2,521 | Not Implemented |
WI0285 # 09 Y:1996 | 09 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,100 | $0 | Not Implemented |
WI0285 # 10 Y:1996 | 10 | 1996 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $380 | $500 | Not Implemented |
WI0279 # 01 Y:1996 | 01 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $18,544 | $3,400 | Not Implemented |
WI0279 # 02 Y:1996 | 02 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $12,559 | $30,000 | Not Implemented |