Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0167 # 01 Y:1999 | 01 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,173 | $1,000 | Implemented |
WV0167 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $809 | $315 | Not Implemented |
WV0167 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $5,901 | $606 | Implemented |
WV0167 # 04 Y:1999 | 04 | 1999 | BURN A LESS EXPENSIVE GRADE OF FUEL | $22,359 | $12,500 | Not Implemented |
WV0167 # 05 Y:1999 | 05 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,784 | $10,000 | Not Implemented |
WV0167 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $804 | $5,500 | Not Implemented |
WV0167 # 07 Y:1999 | 07 | 1999 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $12,120 | $800 | Implemented |
WV0167 # 08 Y:1999 | 08 | 1999 | PURCHASE APPROPRIATELY SIZED MATERIAL | $4,160 | $0 | Not Implemented |
NV0129 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $154 | $225 | Implemented |
NV0129 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $230 | $0 | Implemented |
NV0129 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,578 | $6,112 | Not Implemented |
NV0129 # 04 Y:1999 | 04 | 1999 | USE RADIANT HEATER FOR SPOT HEATING | $485 | $1,149 | Not Implemented |
NV0129 # 05 Y:1999 | 05 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $660 | $400 | Implemented |
NV0129 # 06 Y:1999 | 06 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $335 | $0 | Not Implemented |
TN0660 # 01 Y:1999 | 01 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $56,525 | $880 | Implemented |
TN0660 # 02 Y:1999 | 02 | 1999 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $20,100 | $50,000 | Implemented |
TN0660 # 03 Y:1999 | 03 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,247 | $4,700 | Implemented |
TN0660 # 04 Y:1999 | 04 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,450 | $0 | Not Implemented |
TN0660 # 05 Y:1999 | 05 | 1999 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,360 | $1,070 | Implemented |
TN0660 # 06 Y:1999 | 06 | 1999 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,300 | $8,200 | Implemented |
ND0322 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $639 | $1,458 | Not Implemented |
ND0322 # 02 Y:1999 | 02 | 1999 | USE OPTIMUM TEMPERATURE | $161 | $0 | Implemented |
ND0322 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,357 | $1,250 | Not Implemented |
ND0322 # 04 Y:1999 | 04 | 1999 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $2,056 | $38,197 | Not Implemented |
ND0322 # 05 Y:1999 | 05 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,625 | $4,000 | Not Implemented |