IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0250 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $107 $275 Implemented
UF0250 # 04 Y:2000 04 2000 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,340 $11,000 Not Implemented
UF0250 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $142 $378 Implemented
UF0250 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,454 $1,865 Implemented
UF0250 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $57,590 $0 Not Implemented
UF0250 # 08 Y:2000 08 2000 RECOVER AND REUSE WASTE MATERIAL $20,000 $0 Implemented
UF0250 # 09 Y:2000 09 2000 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $19,507 $8,590 Not Implemented
NC0184 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $133 $120 Not Implemented
NC0184 # 02 Y:2000 02 2000 UPGRADE CONTROLS ON COMPRESSORS $685 $600 Implemented
NC0184 # 03 Y:2000 03 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $163 $240 Implemented
SD0248 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,001 $40,000 Not Implemented
SD0248 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,837 $14,800 Implemented
SD0248 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,532 $7,536 Implemented
SD0248 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,585 $0 Implemented
SD0248 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,887 $4,950 Implemented
SD0248 # 06 Y:2000 06 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $5,300 $12,500 Not Implemented
SD0248 # 07 Y:2000 07 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,600 $1,000 Implemented
SD0248 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $743 $800 Not Implemented
SD0248 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,397 $8,500 Implemented
SD0248 # 10 Y:2000 10 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $70,500 $120,000 Not Implemented
SD0248 # 11 Y:2000 11 2000 INSTALL SYSTEM TO COLLECT SCRAP $13,426 $11,836 Implemented
OK0596 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $299 $1,360 Not Implemented
OK0596 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,864 $345 Not Implemented
OK0596 # 03 Y:2000 03 2000 $6,879 $0 Not Implemented
OK0596 # 04 Y:2000 04 2000 REPAIR AND ELIMINATE STEAM LEAKS $17,180 $800 Not Implemented