IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0464 # 03 Y:2015 03 2015 ADD AREA LIGHTING SWITCHES $6,212 $2,837 Implemented
CO0701 # 01 Y:2015 01 2015 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $32,810 $82,650 Not Implemented
CO0701 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $19,610 $20,000 Implemented
CO0701 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,920 $3,750 Implemented
CO0701 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $2,460 Implemented
MA0744 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,197 $27,500 Not Implemented
MA0744 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $8,840 $12,155 Implemented
MA0744 # 03 Y:2015 03 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,413 $39,000 Not Implemented
MA0744 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,325 $1,800 Implemented
MA0744 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,753 $3,460 Not Implemented
MA0744 # 06 Y:2015 06 2015 REDUCE VENTILATION AIR $2,077 $500 Not Implemented
UK1503 # 01 Y:2015 01 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $605 $960 Implemented
UK1503 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $3,487 $4,040 Implemented
UK1503 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $520 Implemented
UK1503 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $5,138 $3,760 Implemented
UK1503 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,831 $3,000 Implemented
UK1503 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,001 $5,000 Implemented
UK1503 # 07 Y:2015 07 2015 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,126 $1,460 Implemented
UK1503 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $556 $2,470 Implemented
UK1503 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $17,159 $9,380 Implemented
UK1503 # 10 Y:2015 10 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,034 $2,460 Implemented
UK1503 # 11 Y:2015 11 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $62,362 $45,000 Implemented
BS0049 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $394,723 $180,080 Not Implemented
BS0049 # 02 Y:2015 02 2015 AVOID FROST FORMATION ON EVAPORATORS $102,865 $70,430 Not Implemented
BS0049 # 03 Y:2015 03 2015 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $63,716 $137,445 Not Implemented