IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0118 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $616 $960 Not Implemented
BS0118 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $257 $30 Not Implemented
BS0118 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,313 $760 Not Implemented
BS0118 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $821 $275 Not Implemented
BS0118 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $545 $210 Not Implemented
BS0118 # 07 Y:2019 07 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,186 $790 Not Implemented
UU0141 # 01 Y:2019 01 2019 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $377,727 $30 Not Implemented
UU0141 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $176,898 $256,282 Implemented
UU0141 # 03 Y:2019 03 2019 MODERATE COOLING TOWER OUTLET TEMPERATURE $149,664 $22,400 Implemented
UU0141 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,073 $0 Not Implemented
UU0141 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $3,778 $1,225 Implemented
UA0205 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,908 Implemented
UA0205 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $51,026 $98,308 Not Implemented
UA0205 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,422 $18,747 Not Implemented
UA0205 # 04 Y:2019 04 2019 MODIFY STARTUP/SHUTDOWN TIMES $280 $0 Implemented
UA0205 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,670 $1,600 Not Implemented
UD0994 # 01 Y:2019 01 2019 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $100,170 $0 Not Implemented
UD0994 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,091 $700 Not Implemented
UD0994 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,649 $33,788 Not Implemented
UD0994 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $248,034 $337,264 Implemented
UD0994 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,349 $10,250 Not Implemented
UD0994 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,968 $8,550 Not Implemented
AM0770 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $28,900 $38,900 Not Implemented
AM0770 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,150 $2,050 Implemented
AM0770 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,260 $27,700 Implemented