Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0831 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,808 | $21,525 | Not Implemented |
MA0831 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,657 | $42,058 | Implemented |
MA0831 # 08 Y:2022 | 08 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,654 | $15,630 | Not Implemented |
MA0831 # 09 Y:2022 | 09 | 2022 | INSULATE FEEDWATER TANK | $798 | $1,376 | Implemented |
OR0747 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $487 | $1,546 | Not Implemented |
OR0747 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,708 | $7,587 | Not Implemented |
OR0747 # 03 Y:2022 | 03 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $57,063 | $757,015 | Not Implemented |
NL0065 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $102,048 | $20,000 | Implemented |
NL0065 # 02 Y:2022 | 02 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $66,280 | $33,738 | Not Implemented |
NL0065 # 03 Y:2022 | 03 | 2022 | RECOVER AND REUSE COOLING WATER | $66,179 | $102,065 | Implemented |
NL0065 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,067 | $72,620 | Implemented |
NL0065 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,997 | $9,000 | Not Implemented |
NL0065 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,531 | $4,500 | Implemented |
NL0065 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,268 | $4,025 | Not Implemented |
NL0065 # 08 Y:2022 | 08 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,026 | $43 | Not Implemented |
NL0065 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,199 | $4,780 | Not Implemented |
NL0065 # 10 Y:2022 | 10 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,554 | $5,468 | Implemented |
NL0065 # 11 Y:2022 | 11 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $990 | $943 | Not Implemented |
NL0064 # 01 Y:2022 | 01 | 2022 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $79,442 | $292,000 | Implemented |
NL0064 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $1,251 | $1,729 | Implemented |
NL0064 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,248 | $2,875 | Implemented |
NL0064 # 04 Y:2022 | 04 | 2022 | USE HIGH PRESSURE WASH SYSTEMS | $768 | $240 | Implemented |
NL0064 # 05 Y:2022 | 05 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $331 | $90 | Implemented |
NL0064 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $204 | $130 | Implemented |
TT0271 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,479 | $1,500 | Implemented |