IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0418 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,945 $34,619 Not Implemented
UF0418 # 11 Y:2008 11 2008 INSTALL OCCUPANCY SENSORS $5,889 $6,806 Implemented
UF0418 # 12 Y:2008 12 2008 DEVELOP A REPAIR/REPLACE POLICY $729 $0 Implemented
UF0418 # 13 Y:2008 13 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,442 $82,588 Not Implemented
UF0418 # 14 Y:2008 14 2008 CHECK FOR ACCURACY OF UTILITY / POWER METERS $170,526 $5,967 Not Implemented
UF0418 # 15 Y:2008 15 2008 MAINTAIN MACHINES TO REDUCE LEAKS $6,175 $161 Implemented
UF0418 # 16 Y:2008 16 2008 CLEAN FOULING FROM WATER LINES REGULARLY $2,344 $7,838 Implemented
UF0417 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,847 $36,441 Not Implemented
UF0417 # 02 Y:2008 02 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,012 $0 Implemented
UF0417 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,710 $0 Implemented
UF0417 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,992 $0 Implemented
UF0417 # 05 Y:2008 05 2008 INSTALL COMMON HEADER ON COMPRESSORS $14,617 $0 Not Implemented
UF0417 # 06 Y:2008 06 2008 INSTALL COMMON HEADER ON COMPRESSORS $12,647 $900 Not Implemented
UF0417 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,601 $64,339 Not Implemented
UF0417 # 08 Y:2008 08 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,201 $1,200 Not Implemented
UF0417 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $65,568 $31,410 Not Implemented
UF0417 # 10 Y:2008 10 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $45,096 $15,000 Not Implemented
UF0417 # 11 Y:2008 11 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,200 $4,158 Not Implemented
MI0174 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $214,998 $360,000 Not Implemented
MI0174 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $32,694 $2,000 Implemented
MI0174 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,544 $40 Implemented
MI0174 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,041 $1,210 Implemented
MI0174 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,087 $13,200 Not Implemented
MI0174 # 06 Y:2008 06 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,075 $322 Implemented
UF0416 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $950 $4,000 Implemented