IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0167 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,750 $214 Not Implemented
SU0167 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $603 $116 Not Implemented
SU0167 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $6,319 $5,775 Not Implemented
SU0166 # 01 Y:2003 01 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,012 $232 Not Implemented
SU0166 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,388 $480 Not Implemented
SU0166 # 03 Y:2003 03 2003 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $28,125 $10,016 Implemented
SU0166 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,270 $24,797 Not Implemented
SU0166 # 05 Y:2003 05 2003 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $24,000 $19,912 Not Implemented
SU0166 # 06 Y:2003 06 2003 USE EXISTING DAM TO GENERATE ELECTRICITY $49,025 $132,000 Not Implemented
SU0166 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,000 $68,560 Implemented
SU0165 # 01 Y:2003 01 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $99,450 $110,400 Implemented
SU0165 # 02 Y:2003 02 2003 RECOVER AND REUSE SPENT ACID BATHS $30,138 $3,234 Implemented
SU0165 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,370 $17,064 Implemented
SU0165 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,503 $937 Implemented
SU0165 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $9,177 $20,736 Not Implemented
SU0165 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,763 $5,538 Not Implemented
SU0165 # 07 Y:2003 07 2003 UPGRADE CONTROLS ON COMPRESSORS $93,620 $94,691 Implemented
SU0164 # 01 Y:2003 01 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $141,258 $1,171,875 Not Implemented
SU0164 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $115,419 $348,540 Implemented
SU0164 # 03 Y:2003 03 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $30,000 $76,518 Not Implemented
SU0164 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,096 $55,580 Implemented
SU0164 # 05 Y:2003 05 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,721 $0 Implemented
SU0164 # 06 Y:2003 06 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $7,910 $10,000 Not Implemented
SU0164 # 07 Y:2003 07 2003 REDESIGN PROCESS $6,861 $270 Implemented
SU0164 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,485 $700 Implemented