Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0840 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $276 | $25 | Not Implemented |
WV0431 # 01 Y:2011 | 01 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $135,254 | $682,000 | Implemented |
WV0431 # 02 Y:2011 | 02 | 2011 | USE OPTIMUM THICKNESS INSULATION | $29,707 | $75,000 | Not Implemented |
WV0431 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,355 | $11,500 | Not Implemented |
WV0431 # 04 Y:2011 | 04 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,105 | $1,850 | Implemented |
WV0431 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $6,207 | $1,076 | Implemented |
WV0431 # 06 Y:2011 | 06 | 2011 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,020 | $0 | Not Implemented |
WV0431 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $2,808 | $408 | Implemented |
WV0431 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,027 | $1,560 | Implemented |
WV0430 # 01 Y:2011 | 01 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $70,581 | $20,000 | Not Implemented |
WV0430 # 02 Y:2011 | 02 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $43,659 | $3,500 | Implemented |
WV0430 # 03 Y:2011 | 03 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $39,290 | $65,840 | Not Implemented |
WV0430 # 04 Y:2011 | 04 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $34,733 | $26,650 | Implemented |
WV0430 # 05 Y:2011 | 05 | 2011 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $28,475 | $76,200 | Not Implemented |
WV0430 # 06 Y:2011 | 06 | 2011 | OPTIMIZE PLANT POWER FACTOR | $25,696 | $37,805 | Not Implemented |
WV0430 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,692 | $37,460 | Implemented |
WV0430 # 08 Y:2011 | 08 | 2011 | COMBINE UTILITY METERS | $10,426 | $20,000 | Not Implemented |
WV0430 # 09 Y:2011 | 09 | 2011 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,265 | $57,400 | Not Implemented |
UD0839 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,985 | $5,668 | Implemented |
UD0839 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $1,620 | $1,875 | Not Implemented |
UD0839 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $58,395 | $500 | Implemented |
UD0839 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,472 | $0 | Implemented |
UD0839 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,623 | $5,000 | Not Implemented |
UD0839 # 06 Y:2011 | 06 | 2011 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $80,401 | $90,000 | Not Implemented |
UD0839 # 07 Y:2011 | 07 | 2011 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $29,882 | $59,764 | Not Implemented |