IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0735 # 15 Y:2006 15 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $376 $214 Not Implemented
UD0735 # 16 Y:2006 16 2006 INSULATE BARE EQUIPMENT $245 $110 Implemented
BD0301 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $94,570 $91,000 Implemented
BD0301 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $43,599 $22,780 Implemented
BD0301 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,786 $1,800 Implemented
BD0301 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $1,759 $1,750 Implemented
BD0301 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $500 Implemented
BD0301 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $911 $1,960 Not Implemented
BD0301 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $763 $500 Implemented
BD0301 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $342 $350 Implemented
BD0301 # 09 Y:2006 09 2006 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $40,050 $22,800 Not Implemented
BD0301 # 10 Y:2006 10 2006 AUTOMATE FINISHING PROCESS $1,669,200 $285,000 Implemented
BD0301 # 11 Y:2006 11 2006 PAY BILLS ON TIME TO AVOID LATE FEES $995 $0 Implemented
SU0230 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,527 $0 Implemented
SU0230 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,958 $0 Implemented
SU0230 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $6,237 $0 Implemented
SU0230 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,565 $0 Implemented
SU0230 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,565 $1,608 Implemented
SU0230 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72,359 $27,000 Implemented
SU0230 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,657 $1,484 Implemented
SU0230 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,115 $5,820 Not Implemented
SU0230 # 09 Y:2006 09 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $444 $746 Not Implemented
SU0230 # 10 Y:2006 10 2006 OPTIMIZE PLANT POWER FACTOR $2,349 $9,623 Not Implemented
UM0298 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,759 $1,050 Not Implemented
UM0298 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,355 $1,863 Not Implemented