Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0291 # 03 Y:2016 | 03 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $11,963 | $23,683 | Not Implemented |
MI0291 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,153 | $1,660 | Implemented |
MI0291 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,659 | $40 | Implemented |
MI0291 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,876 | $40 | Implemented |
MI0291 # 07 Y:2016 | 07 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,625 | $3,600 | Implemented |
MI0291 # 08 Y:2016 | 08 | 2016 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $2,195 | $1,128 | Not Implemented |
MI0291 # 09 Y:2016 | 09 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,071 | $120 | Implemented |
MI0291 # 10 Y:2016 | 10 | 2016 | PAY UTILITY BILLS ON TIME | $1,589 | $0 | Implemented |
MI0291 # 11 Y:2016 | 11 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,180 | $760 | Implemented |
MI0291 # 12 Y:2016 | 12 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,118 | $4,691 | Not Implemented |
MI0291 # 13 Y:2016 | 13 | 2016 | INSTALL OCCUPANCY SENSORS | $889 | $683 | Implemented |
DL0159 # 01 Y:2016 | 01 | 2016 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $287,810 | $31,000 | Implemented |
DL0159 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,000 | $100,750 | Implemented |
DL0159 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,300 | $17,825 | Implemented |
DL0159 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,590 | $188,100 | Implemented |
AM0700 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $10,300 | $23,900 | Not Implemented |
AM0700 # 02 Y:2016 | 02 | 2016 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,892 | $0 | Implemented |
AM0700 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,503 | $0 | Not Implemented |
AM0700 # 04 Y:2016 | 04 | 2016 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,335 | $150 | Implemented |
AM0700 # 05 Y:2016 | 05 | 2016 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,035 | $13 | Not Implemented |
AM0700 # 06 Y:2016 | 06 | 2016 | INSTALL SKYLIGHTS | $1,030 | $5,100 | Not Implemented |
AM0700 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $19 | Implemented |
AM0700 # 08 Y:2016 | 08 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $280 | $62 | Not Implemented |
AM0700 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $615 | $180 | Implemented |
BD0477 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,854 | $42,330 | Not Implemented |