Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,405
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0148 # 03 Y:1998 | 03 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $7,677 | $10,000 | Implemented |
NC0148 # 04 Y:1998 | 04 | 1998 | INSTALL EQUIPMENT TO MOVE PRODUCT | $63,429 | $80,000 | Implemented |
NC0144 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,673 | $14,934 | Not Implemented |
NC0144 # 02 Y:1998 | 02 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,664 | $1,000 | Implemented |
NC0144 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,696 | $12,000 | Not Implemented |
NC0144 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,617 | $4,731 | Implemented |
NC0144 # 05 Y:1998 | 05 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $113 | $200 | Implemented |
NC0144 # 06 Y:1998 | 06 | 1998 | METER WASTE WATER | $1,464 | $200 | Implemented |
NC0144 # 07 Y:1998 | 07 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $5,550 | $2,700 | Implemented |
NC0144 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,325 | $12,000 | Not Implemented |
NC0146 # 01 Y:1998 | 01 | 1998 | COVER OPEN TANKS | $488 | $600 | Implemented |
NC0146 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $920 | $800 | Implemented |
NC0146 # 03 Y:1998 | 03 | 1998 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $409 | $1,480 | Implemented |
NC0146 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $178 | $200 | Implemented |
NC0146 # 05 Y:1998 | 05 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,890 | $1,500 | Implemented |
NC0146 # 06 Y:1998 | 06 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $2,431 | $0 | Implemented |
TN0639 # 01 Y:1998 | 01 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $74,290 | $26,180 | Implemented |
TN0639 # 02 Y:1998 | 02 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $5,440 | $3,440 | Implemented |
TN0639 # 03 Y:1998 | 03 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $4,680 | $0 | Implemented |
TN0639 # 04 Y:1998 | 04 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $1,200 | $0 | Implemented |
TN0639 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $754 | $950 | Implemented |
TN0639 # 06 Y:1998 | 06 | 1998 | USE OPTIMUM THICKNESS INSULATION | $470 | $1,125 | Not Implemented |
NC0143 # 01 Y:1998 | 01 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,467 | $700 | Implemented |
NC0143 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $50,294 | $280,937 | Not Implemented |
NC0143 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,615 | $25,600 | Not Implemented |