IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0230 # 16 Y:2000 16 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,000 $1,300 Not Implemented
HO0230 # 17 Y:2000 17 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $50,000 $2,300 Not Implemented
HO0230 # 18 Y:2000 18 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $540 $395 Not Implemented
HO0230 # 19 Y:2000 19 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $675 $475 Not Implemented
HO0230 # 20 Y:2000 20 2000 DEVELOP STANDARD OPERATING PROCEDURES $8,520 $8,000 Not Implemented
HO0230 # 21 Y:2000 21 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $24,000 $4,000 Not Implemented
HO0230 # 22 Y:2000 22 2000 IMPROVE HANDLING PRACTICES $1,950 $100 Not Implemented
HO0230 # 23 Y:2000 23 2000 MOVE PRODUCT USING MECHANICAL MEANS $3,900 $5,000 Not Implemented
HO0230 # 24 Y:2000 24 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $15,600 $500 Not Implemented
HO0230 # 25 Y:2000 25 2000 REDUCE SCRAP PRODUCTION $600 $5,000 Not Implemented
KU0539 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $163,360 $135,000 Not Implemented
KU0539 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $44,700 $30,000 Not Implemented
KU0539 # 03 Y:2000 03 2000 USE OPTIMUM TEMPERATURE $15,700 $20,000 Implemented
KU0539 # 04 Y:2000 04 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,800 $0 Not Implemented
KU0539 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,070 $5,750 Not Implemented
KU0539 # 06 Y:2000 06 2000 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $77,640 $85,000 Not Implemented
GT0688 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,444 $2,240 Implemented
GT0688 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,360 $15,907 Not Implemented
GT0688 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $12,285 Not Implemented
GT0688 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,760 $1,050 Not Implemented
GT0688 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $280 $800 Implemented
GT0688 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,022 $53,400 Implemented
GT0688 # 07 Y:2000 07 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,920 $450 Not Implemented
GT0688 # 08 Y:2000 08 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,435 $4,950 Not Implemented
SF0191 # 01 Y:2000 01 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $6,345 $4,320 Not Implemented