Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0470 # 02 Y:2004 | 02 | 2004 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $4,976 | $28,750 | Not Implemented |
WI0470 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,832 | $0 | Not Implemented |
WI0470 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,353 | $5,780 | Implemented |
WI0470 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,484 | $896 | Implemented |
WI0470 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,293 | $0 | Implemented |
WI0470 # 07 Y:2004 | 07 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,075 | $4,000 | Not Implemented |
WI0470 # 08 Y:2004 | 08 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $579 | $0 | Not Implemented |
LM0075 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $757 | $175 | Implemented |
LM0075 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,356 | $1,854 | Not Implemented |
LM0075 # 03 Y:2004 | 03 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $552 | $779 | Not Implemented |
LM0075 # 04 Y:2004 | 04 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $156,419 | $6,500 | Implemented |
LM0075 # 05 Y:2004 | 05 | 2004 | DEVELOP STANDARD OPERATING PROCEDURES | $14,640 | $6,500 | Not Implemented |
LM0075 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $309 | $101 | Implemented |
LM0075 # 07 Y:2004 | 07 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,431 | $470 | Not Implemented |
SF0283 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,759 | $0 | Implemented |
SF0283 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,304 | $0 | Not Implemented |
SF0283 # 03 Y:2004 | 03 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,636 | $829 | Implemented |
SF0283 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,377 | $31,490 | Implemented |
SF0283 # 05 Y:2004 | 05 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $61,990 | $40,000 | Implemented |
SF0283 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,808 | $20,000 | Not Implemented |
SF0283 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $1,284 | $1,218 | Implemented |
SF0283 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,669 | $10,828 | Implemented |
SF0283 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $1,066 | $2,688 | Implemented |
SF0283 # 10 Y:2004 | 10 | 2004 | USE AN AUTOMATIC PLATE PROCESSOR | $27,300 | $40,500 | Implemented |
SF0283 # 11 Y:2004 | 11 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $227,033 | $40,600 | Not Implemented |