Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0167 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,995 | $132,686 | Implemented |
MI0167 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,111 | $61,964 | Implemented |
MI0167 # 04 Y:2008 | 04 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,032 | $5,700 | Implemented |
MI0167 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,393 | $1,210 | Implemented |
MI0167 # 06 Y:2008 | 06 | 2008 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $7,627 | $15,500 | Implemented |
MI0166 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $360,093 | $695,000 | Not Implemented |
MI0166 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $70,996 | $1,200 | Implemented |
MI0166 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,899 | $41,800 | Implemented |
MI0166 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,060 | $1,210 | Implemented |
MI0166 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $40 | Implemented |
MI0166 # 06 Y:2008 | 06 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,677 | $3,475 | Not Implemented |
UF0412 # 01 Y:2008 | 01 | 2008 | INSTALL OCCUPANCY SENSORS | $207 | $79 | Not Implemented |
UF0412 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,683 | $42,414 | Implemented |
UF0412 # 03 Y:2008 | 03 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $12,505 | $731 | Implemented |
UF0412 # 04 Y:2008 | 04 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,855 | $795 | Not Implemented |
UF0412 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $17,781 | $615 | Implemented |
UF0412 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,521 | $0 | Implemented |
UF0412 # 07 Y:2008 | 07 | 2008 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $2,081 | $534 | Not Implemented |
UF0412 # 08 Y:2008 | 08 | 2008 | INSTALL SET-BACK TIMERS | $15,103 | $4,916 | Implemented |
UF0412 # 09 Y:2008 | 09 | 2008 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,822 | $10,480 | Implemented |
UF0412 # 10 Y:2008 | 10 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $95,676 | $20,000 | Not Implemented |
UF0412 # 11 Y:2008 | 11 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,359 | $4,246 | Implemented |
UF0411 # 01 Y:2008 | 01 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,719 | $4,557 | Not Implemented |
UF0411 # 02 Y:2008 | 02 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,620 | $6,301 | Not Implemented |
UF0411 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,287 | $40,292 | Implemented |