IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0191 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $833 $1,707 Not Implemented
SF0191 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,529 $32,232 Not Implemented
OR0364 # 01 Y:2000 01 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,700 $600 Implemented
OR0364 # 02 Y:2000 02 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $57,110 $38,980 Not Implemented
OR0364 # 03 Y:2000 03 2000 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $7,011 $12,500 Not Implemented
UM0163 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,712 $84,426 Not Implemented
UM0163 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,248 $0 Implemented
UM0163 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,496 $500 Implemented
UM0163 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,147 $300 Implemented
UM0163 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,922 $1,500 Not Implemented
UM0163 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $2,100 $200 Not Implemented
UM0163 # 07 Y:2000 07 2000 INSULATE BARE EQUIPMENT $10,078 $10,000 Not Implemented
UM0163 # 08 Y:2000 08 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,512 $60,000 Not Implemented
UM0163 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,997 $90,000 Implemented
UD0596 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,230 $60,000 Not Implemented
UD0596 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,200 $27,423 Implemented
UD0596 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $4,221 $1,200 Implemented
UD0596 # 04 Y:2000 04 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,651 $1,298 Not Implemented
UD0596 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,699 $3,072 Not Implemented
OK0594 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,935 $800 Implemented
OK0594 # 02 Y:2000 02 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,177 $13,490 Implemented
OK0594 # 03 Y:2000 03 2000 INSTALL SKYLIGHTS $3,419 $2,000 Implemented
OK0594 # 04 Y:2000 04 2000 AUTOMATE FINISHING PROCESS $137,280 $200,000 Not Implemented
OK0594 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $3,339 $860 Implemented
OK0594 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,028 $0 Not Implemented