IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0155 # 10 Y:2003 10 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $381 $500 Implemented
SU0155 # 11 Y:2003 11 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $326 $0 Implemented
SU0156 # 01 Y:2003 01 2003 RECOVER AND REUSE SPENT ACID BATHS $21,400 $1,800 Implemented
SU0156 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $8,364 Implemented
SU0156 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,283 $995 Implemented
SU0156 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,534 $327 Implemented
SU0156 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,059 $0 Implemented
SU0154 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $11,147 $820 Not Implemented
SU0154 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $692 $133 Implemented
SU0154 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $0 Not Implemented
SU0154 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $601 $264 Not Implemented
SU0154 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $134 $120 Implemented
SU0153 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,642 $93,355 Implemented
SU0153 # 02 Y:2003 02 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $42,094 $93,819 Not Implemented
SU0153 # 03 Y:2003 03 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $30,876 $11,602 Implemented
SU0153 # 04 Y:2003 04 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,993 $7,176 Not Implemented
SU0153 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,229 $438 Implemented
SU0153 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $5,043 $16,501 Implemented
SU0153 # 07 Y:2003 07 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,900 $16,700 Implemented
SU0153 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,098 $12,105 Not Implemented
SU0153 # 09 Y:2003 09 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,467 $163 Implemented
SU0153 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $882 $249 Not Implemented
SU0151 # 01 Y:2003 01 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,975 $2,044 Not Implemented
SU0151 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,781 $0 Implemented
SU0151 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,604 $8,000 Not Implemented