IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0382 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $461 $1,590 Not Implemented
SU0382 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $394 $1,415 Not Implemented
SU0382 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $68 $324 Not Implemented
UA0136 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $62,198 $11,224 Not Implemented
UA0136 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,296 $22,500 Not Implemented
UA0136 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,414 $50 Not Implemented
UA0136 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,776 $2,922 Implemented
UA0136 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $2,916 $5,250 Not Implemented
UA0136 # 06 Y:2015 06 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,386 $0 Not Implemented
UA0136 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,384 $14,682 Not Implemented
MI0275 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $85,489 $171,258 Implemented
MI0275 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $14,615 $840 Implemented
MI0275 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,526 $45,190 Implemented
MI0275 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,206 $18,462 Implemented
MI0275 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,264 $5,922 Implemented
MI0275 # 06 Y:2015 06 2015 USE PHOTOCELL CONTROLS $507 $360 Implemented
MI0275 # 07 Y:2015 07 2015 PAY UTILITY BILLS ON TIME $19 $80 Implemented
IP0036 # 01 Y:2015 01 2015 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $102,924 $0 Not Implemented
IP0036 # 02 Y:2015 02 2015 USE OPTIMUM TEMPERATURE $1,853 $0 Not Implemented
IP0036 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,622 $560 Not Implemented
IP0036 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,492 $0 Not Implemented
IP0036 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,188 $0 Not Implemented
IP0036 # 06 Y:2015 06 2015 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $61 $19 Not Implemented
IP0036 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,161 $1,811 Not Implemented
IP0036 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $1,780 Not Implemented