IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0151 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,447 $932 Not Implemented
SU0151 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,287 $60 Implemented
SU0151 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,055 $1,635 Not Implemented
SU0151 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $568 $0 Not Implemented
SU0150 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,229 $6,100 Not Implemented
SU0150 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,655 $2,035 Not Implemented
SU0150 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $1,138 $5,410 Not Implemented
SU0150 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $1,003 $1,065 Not Implemented
SU0150 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $720 $133 Implemented
SU0150 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $376 $0 Not Implemented
SU0150 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $1,031 Not Implemented
SU0150 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $107 $0 Implemented
SU0152 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,627 $14,850 n/a
SU0152 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,105 $110 n/a
SU0152 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,683 $10,300 n/a
SU0152 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $5,043 $16,500 n/a
SU0152 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,217 $160 n/a
SU0152 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,659 $270 n/a
SU0152 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,192 $103 n/a
SU0149 # 01 Y:2003 01 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $360,580 $1,153,710 Not Implemented
SU0149 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $30,833 $30,000 Not Implemented
SU0149 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $7,864 $4,382 Not Implemented
SU0149 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $3,295 $6,573 Not Implemented
SU0149 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,888 $500 Not Implemented
SU0148 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $163,907 $767,895 Not Implemented