Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1064 # 03 Y:2022 | 03 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $367 | $700 | Implemented |
OK1064 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,414 | $774 | Implemented |
UF0573 # 01 Y:2022 | 01 | 2022 | USE EXISTING DAM TO GENERATE ELECTRICITY | $223,605 | $552,197 | Implemented |
UF0573 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $50,619 | $45,817 | Implemented |
UF0573 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $35,580 | $50,843 | Implemented |
UF0573 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $324,658 | $1,232,000 | Implemented |
UF0573 # 05 Y:2022 | 05 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $35,912 | $10,000 | Implemented |
UF0573 # 06 Y:2022 | 06 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $4,292 | $0 | Implemented |
UF0572 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,857 | $359,360 | Implemented |
UF0572 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $27,950 | $26,859 | Implemented |
UF0572 # 03 Y:2022 | 03 | 2022 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,159 | $10,627 | Implemented |
UF0572 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,152 | $3,218 | Implemented |
UF0572 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $4,007 | $8,760 | Implemented |
UF0572 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,414 | $756 | Implemented |
UF0572 # 07 Y:2022 | 07 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,245 | $11,975 | Implemented |
UF0572 # 08 Y:2022 | 08 | 2022 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,635 | $4,650 | Implemented |
LS2207 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,349 | $350 | Not Implemented |
LS2207 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,876 | $30,073 | Implemented |
LS2207 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,432 | $32,496 | Implemented |
LS2207 # 04 Y:2022 | 04 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,650 | $158,575 | Implemented |
LS2207 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $136,185 | $2,775,000 | Not Implemented |
LS2206 # 01 Y:2022 | 01 | 2022 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,066 | $10 | Implemented |
LS2206 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,014 | $25 | Implemented |
LS2206 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,034 | $630 | Implemented |
LS2206 # 04 Y:2022 | 04 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $336 | $250 | Implemented |