IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0831 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $10,495 Implemented
UD0831 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,848 $12,100 Not Implemented
UD0831 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $904 $1,167 Not Implemented
UD0831 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $189 $240 Implemented
UD0831 # 08 Y:2011 08 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $137 $25 Implemented
WV0422 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,044 $18,250 Not Implemented
WV0422 # 02 Y:2011 02 2011 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $9,494 $17,598 Not Implemented
WV0422 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,167 $1,000 Implemented
WV0422 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,049 $2,000 Implemented
WV0422 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,822 $1,150 Implemented
WV0422 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,969 $920 Not Implemented
WV0422 # 07 Y:2011 07 2011 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,500 $2,875 Not Implemented
WV0422 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,008 $50 Implemented
WV0422 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $954 $363 Implemented
WV0422 # 10 Y:2011 10 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $750 $329 Not Implemented
WV0421 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,602 $33,993 Not Implemented
WV0421 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,118 $28,554 Implemented
WV0421 # 03 Y:2011 03 2011 COVER OPEN TANKS $15,551 $3,659 Not Implemented
WV0421 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,529 $2,469 Implemented
WV0421 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,567 $10,314 Not Implemented
WV0421 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,339 $3,000 Not Implemented
WV0421 # 07 Y:2011 07 2011 DEVELOP A REPAIR/REPLACE POLICY $4,203 $841 Implemented
WV0421 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $4,166 $1,910 Implemented
WV0421 # 09 Y:2011 09 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,091 $1,163 Not Implemented
WV0421 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,731 $21 Implemented