IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0109 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,613 $0 Not Implemented
BD0109 # 08 Y:1998 08 1998 PAY BILLS ON TIME TO AVOID LATE FEES $263 $0 Implemented
CO0415 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,850 $3,500 n/a
CO0415 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $334 n/a
CO0415 # 03 Y:1998 03 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $810 $1,580 n/a
CO0415 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $700 $1,250 n/a
CO0415 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $238 n/a
CO0415 # 06 Y:1998 06 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $4,830 $2,450 n/a
CO0415 # 07 Y:1998 07 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $420 $0 n/a
CO0415 # 08 Y:1998 08 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $330 $0 n/a
CO0415 # 09 Y:1998 09 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $3,340 $400 n/a
WI0324 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,936 $0 Not Implemented
WI0324 # 02 Y:1998 02 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $487 $0 Implemented
WI0324 # 03 Y:1998 03 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,780 $850 Not Implemented
WI0324 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,054 $400 Implemented
WI0324 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $381 $90 Implemented
WI0324 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $372 $640 Implemented
WI0324 # 07 Y:1998 07 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,039 $0 Not Implemented
SF0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $927 $0 Implemented
SF0141 # 02 Y:1998 02 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $231 $204 Not Implemented
SF0141 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $408 $358 Not Implemented
SF0141 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $1,692 $1,797 Not Implemented
SF0141 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $2,101 $4,080 Not Implemented
SF0141 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,436 $3,582 Implemented
SF0141 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,722 $17,970 Not Implemented