IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0417 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,453 $1,560 Not Implemented
WI0417 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,606 $339 Implemented
WI0417 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,318 $740 Implemented
WI0417 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $923 $1,647 Implemented
UD0642 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $39,312 $0 Not Implemented
UD0642 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $8,274 $39,600 Not Implemented
UD0642 # 03 Y:2002 03 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,876 $5,000 Not Implemented
UD0642 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,364 $7,000 Implemented
UD0642 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,027 $1,450 Implemented
UD0642 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $400 Implemented
UD0642 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $338 $800 Not Implemented
UM0212 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59,075 $182,900 Not Implemented
UM0212 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $10,035 Not Implemented
UM0212 # 03 Y:2002 03 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,407 $500 Not Implemented
UM0212 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $2,000 $1,000 Not Implemented
UM0212 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,885 $2,786 Not Implemented
UM0212 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,270 $3,417 Not Implemented
AM0413 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,700 $76,400 Not Implemented
AM0413 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $1,000 Implemented
AM0413 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $5,000 $0 Implemented
AM0413 # 04 Y:2002 04 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,800 $5,600 Implemented
AM0413 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $830 $400 Implemented
AM0413 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $470 $0 Not Implemented
AM0413 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $320 $0 Not Implemented
AM0413 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $230 $40 Implemented