IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1077 # 02 Y:2024 02 2024 USE HEAT PUMP FOR SPACE CONDITIONING $2,002 $25,200 Not Implemented
UD1077 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $145 $550 Not Implemented
UD1077 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $6,384 $78,400 Not Implemented
IC0297 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,288 $1,336 Implemented
IC0297 # 02 Y:2024 02 2024 INSULATE BARE EQUIPMENT $5,801 $2,620 Implemented
IC0297 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $2,641 $1,066 Implemented
IC0297 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $26,122 $13,370 Implemented
IC0297 # 05 Y:2024 05 2024 USE OPTIMUM THICKNESS INSULATION $2,433 $1,693 Implemented
IC0297 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,704 $1,123 Not Implemented
IC0297 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $289,074 $1,202,972 Not Implemented
IC0297 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,754 $36,000 Implemented
IC0297 # 09 Y:2024 09 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $983 $378 Not Implemented
IC0297 # 10 Y:2024 10 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,801 $0 Implemented
IC0297 # 11 Y:2024 11 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,441 $13,680 Not Implemented
IC0297 # 12 Y:2024 12 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,395 $609 Implemented
IC0297 # 13 Y:2024 13 2024 REPAIR AND ELIMINATE STEAM LEAKS $4,854 $360 Implemented
IC0297 # 14 Y:2024 14 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $119 $0 Implemented
IC0297 # 15 Y:2024 15 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,222 $0 Implemented
IC0297 # 16 Y:2024 16 2024 USE RADIANT HEATER FOR SPOT HEATING $57,855 $47,950 Not Implemented
UU0245 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,514 $18,000 Implemented
UU0245 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,693 $25,330 Not Implemented
UU0245 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,961 $3,200 Implemented
UU0245 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $299 $100 Implemented
LE0559 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $100 n/a
LE0559 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $704 $450 n/a