IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2203 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,063 $4,340 Not Implemented
UL2203 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,985 $0 Implemented
UL2203 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,720 $15,000 Not Implemented
UL2203 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $79,271 $45,460 Implemented
UL2203 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $26,616 $369,011 Not Implemented
UL2202 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,158 $0 Implemented
UL2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,861 $12,941 Implemented
UL2202 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,677 $0 Implemented
UL2202 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $649 $0 Not Implemented
UL2202 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $16,897 $12,250 Not Implemented
UL2202 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,126 $1,220,427 Not Implemented
UL2202 # 07 Y:2022 07 2022 DEVELOP A REPAIR/REPLACE POLICY $495 $4,750 Not Implemented
UL2202 # 08 Y:2022 08 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,941 $0 Implemented
TT0265 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $12,477 $2,065 Not Implemented
TT0265 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,704 $9,000 Not Implemented
TT0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,587 $3,967 Implemented
UK2107 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,932 $3,950 n/a
UK2107 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,788 $0 n/a
UK2107 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $662 $150 n/a
UK2107 # 04 Y:2021 04 2021 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,257 $1,770 n/a
UK2107 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $2,733 $2,931 n/a
UK2107 # 06 Y:2021 06 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,085 $797 n/a
UK2106 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,854 $1,665 n/a
UK2106 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,964 $0 n/a
UK2106 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,660 n/a