IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,636

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0668 # 05 Y:2014 05 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,110 $0 Implemented
AM0668 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $450 $60 Not Implemented
UA0130 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $15,715 $35,154 Not Implemented
UA0130 # 02 Y:2014 02 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,506 $6,410 Not Implemented
UA0130 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,774 $200 Implemented
UA0130 # 04 Y:2014 04 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,266 $0 Implemented
UA0130 # 05 Y:2014 05 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $6,867 $4,120 Not Implemented
UA0130 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,986 $2,522 Not Implemented
UA0130 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,890 $100 Implemented
UA0112 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,737 $19,304 Not Implemented
UA0112 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,385 $2,330 Implemented
UA0112 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,177 $878 Implemented
UA0112 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,965 $49,792 Not Implemented
UA0112 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,143 $520 Not Implemented
UA0101 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $16,195 $150 Implemented
UA0101 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,664 $7,400 Not Implemented
UA0101 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,670 $80 Implemented
UA0101 # 04 Y:2013 04 2013 MINIMIZE WATER USAGE $20,266 $8,192 Not Implemented
UA0101 # 05 Y:2013 05 2013 USE PHOTOCELL CONTROLS $580 $251 Implemented
UA0101 # 06 Y:2013 06 2013 REPLACE BOILER $14,175 $112,000 Not Implemented
UA0099 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109,678 $164,833 Not Implemented
UA0099 # 02 Y:2013 02 2013 DISCONNECT BALLASTS $3,632 $242 Not Implemented
UA0099 # 03 Y:2013 03 2013 USE RADIANT HEATER FOR SPOT HEATING $25,020 $52,360 Not Implemented
UA0099 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $19,434 $14,980 Not Implemented
UA0099 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,301 $5,000 Implemented