IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

894

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0527 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,543 $0 Not Implemented
MA0527 # 07 Y:2003 07 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,300 $0 Not Implemented
MA0527 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $869 $0 Not Implemented
MA0527 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $477 $500 Not Implemented
MA0527 # 10 Y:2003 10 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $137 $0 Not Implemented
MA0526 # 01 Y:2003 01 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $29,601 $51,300 n/a
MA0526 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $20,577 $40,000 Not Implemented
MA0526 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $5,194 $5,150 n/a
MA0526 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,324 $11,500 n/a
MA0526 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $3,638 $6,300 Not Implemented
MA0526 # 06 Y:2003 06 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,179 $2,970 Not Implemented
MA0526 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,169 $0 Implemented
MA0526 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $1,138 $600 Not Implemented
MA0513 # 01 Y:2002 01 2002 USE MINIMUM SAFE OVEN VENTILATION $10,252 $10,000 Not Implemented
MA0513 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,583 $10,000 Not Implemented
MA0513 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,565 $0 Implemented
MA0513 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,070 $1,000 Implemented
MA0513 # 05 Y:2002 05 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $680 $5,000 Not Implemented
MA0513 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $236 $500 Implemented
MA0510 # 01 Y:2002 01 2002 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $16,518 $13,775 n/a
MA0510 # 02 Y:2002 02 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,976 $7,800 Not Implemented
MA0510 # 03 Y:2002 03 2002 COMBINE UTILITY METERS $2,200 $6,470 Not Implemented
MA0510 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $1,849 $0 Implemented
MA0510 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,619 $0 Implemented
MA0510 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,604 $1,792 Implemented