Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0537 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,920 | $245,000 | Implemented |
LE0536 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,791 | $0 | Implemented |
LE0536 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,036 | $2,440 | Implemented |
LE0536 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,974 | $35,815 | Implemented |
LE0536 # 04 Y:2023 | 04 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $28,034 | $80,000 | Not Implemented |
LE0536 # 05 Y:2023 | 05 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,556 | $15,000 | Not Implemented |
LE0536 # 06 Y:2023 | 06 | 2023 | ELIMINATE A BY-PRODUCT | $188,025 | $700,000 | Not Implemented |
LE0536 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,147 | $200,000 | Not Implemented |
WV0632 # 08 Y:2022 | 08 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $727 | $92 | Implemented |
WV0632 # 01 Y:2022 | 01 | 2022 | MINIMIZE WATER USAGE | $12,558 | $11,644 | Not Implemented |
WV0632 # 02 Y:2022 | 02 | 2022 | IMPROVE COMBUSTION CONTROL CAPABILITY | $5,035 | $3,423 | Implemented |
WV0632 # 03 Y:2022 | 03 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $4,403 | $2,234 | Not Implemented |
WV0632 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,805 | $706 | Implemented |
WV0632 # 05 Y:2022 | 05 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,169 | $5,688 | Not Implemented |
WV0632 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $1,112 | $1,037 | Implemented |
WV0632 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $865 | $2,227 | Not Implemented |
WV0632 # 09 Y:2022 | 09 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $714 | $1,638 | Implemented |
WV0632 # 10 Y:2022 | 10 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $669 | $3,115 | Implemented |
WV0632 # 11 Y:2022 | 11 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $456 | $1,192 | Implemented |
WV0632 # 12 Y:2022 | 12 | 2022 | INSTALL OCCUPANCY SENSORS | $371 | $1,135 | Implemented |
LE0535 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,826 | $6,362 | Not Implemented |
LE0535 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $684 | $780 | Not Implemented |
LE0535 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,728 | $2,200 | Not Implemented |
LE0535 # 04 Y:2022 | 04 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $246,141 | $750,000 | Not Implemented |
LE0535 # 05 Y:2022 | 05 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $44,811 | $140,000 | Not Implemented |