Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0117 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,573 | $1,650 | Not Implemented |
BS0117 # 05 Y:2019 | 05 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $3,322 | $502 | Not Implemented |
OR0712 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $200,991 | $689,600 | Implemented |
OR0712 # 02 Y:2018 | 02 | 2018 | REPLACE BOILER | $56,825 | $365,566 | Not Implemented |
OR0712 # 03 Y:2018 | 03 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $33,804 | $25,271 | Not Implemented |
OR0712 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,006 | $21,662 | Not Implemented |
OR0712 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $17,619 | $17,511 | Implemented |
OR0712 # 06 Y:2018 | 06 | 2018 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $6,403 | $30,000 | Implemented |
OR0711 # 01 Y:2018 | 01 | 2018 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $1,082,323 | $800,001 | Not Implemented |
OR0711 # 02 Y:2018 | 02 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $68,286 | $68,224 | Not Implemented |
OR0711 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,749 | $10,303 | Not Implemented |
OR0711 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,277 | $1,904 | Not Implemented |
OR0711 # 05 Y:2018 | 05 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,097 | $30,240 | Not Implemented |
OR0702 # 01 Y:2018 | 01 | 2018 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $20,800 | $7,140 | Not Implemented |
OR0702 # 02 Y:2018 | 02 | 2018 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,088 | $660 | Not Implemented |
OR0702 # 03 Y:2018 | 03 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,409 | $1,005 | Not Implemented |
OR0702 # 04 Y:2018 | 04 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,065 | $5,807 | Not Implemented |
OR0701 # 01 Y:2018 | 01 | 2018 | INSTALL SYSTEM TO COLLECT SCRAP | $35,903 | $29,900 | Not Implemented |
OR0701 # 02 Y:2018 | 02 | 2018 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $17,929 | $8,549 | Not Implemented |
OR0701 # 03 Y:2018 | 03 | 2018 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,954 | $11,773 | Not Implemented |
OR0701 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,441 | $4,175 | Not Implemented |
BS0107 # 01 Y:2017 | 01 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,338 | $5,117 | Not Implemented |
BS0107 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,846 | $2,224 | Not Implemented |
BS0107 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,395 | $2,640 | Not Implemented |
BS0107 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $54,676 | $1,500 | Not Implemented |