IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0427 # 08 Y:2009 08 2009 $2,066 $0 Not Implemented
UF0427 # 09 Y:2009 09 2009 PAY UTILITY BILLS ON TIME $477 $0 Implemented
UF0427 # 10 Y:2009 10 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,802 $0 Not Implemented
UF0427 # 11 Y:2009 11 2009 RECYCLE CLEANING SOLVENT AND REUSE $3,440 $20,000 Not Implemented
UD0807 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,275 $2,000 Implemented
UD0807 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,575 $1,000 Implemented
UD0807 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $65,548 $15,550 Not Implemented
UD0807 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,604 $1,000 Not Implemented
UD0807 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,056 $52,550 Not Implemented
UD0807 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $1,564 $7,000 Not Implemented
UD0807 # 07 Y:2009 07 2009 OPTIMIZE PLANT POWER FACTOR $78,142 $100,000 Not Implemented
UD0807 # 08 Y:2009 08 2009 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $22,644 $0 Not Implemented
UD0807 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,425 $8,602 Implemented
UD0807 # 10 Y:2009 10 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,853 $0 Not Implemented
UD0807 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,719 $23,924 Not Implemented
UD0807 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,249 $4,614 Implemented
UD0807 # 13 Y:2009 13 2009 MINIMIZE WATER USAGE $5,548 $5,000 Not Implemented
UD0807 # 14 Y:2009 14 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,896 $0 Not Implemented
UD0807 # 15 Y:2009 15 2009 INSULATE BARE EQUIPMENT $3,086 $2,700 Not Implemented
UD0807 # 16 Y:2009 16 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $2,000 Not Implemented
UD0807 # 17 Y:2009 17 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $2,533 Implemented
WV0397 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $153,645 $145,000 Not Implemented
WV0397 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,057 $131,239 Not Implemented
WV0397 # 03 Y:2009 03 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $77,885 $17,000 Not Implemented
WV0397 # 04 Y:2009 04 2009 OPERATE BOILERS ON HIGH FIRE SETTING $56,916 $80,000 Not Implemented