IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0147 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,126 $7,590 Not Implemented
SU0147 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,432 $2,288 Not Implemented
SU0147 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $2,974 $8,850 Not Implemented
SU0147 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,193 $1,528 Not Implemented
SU0147 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,104 $5,675 Not Implemented
SU0147 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,381 $437 Not Implemented
SU0147 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $694 $196 Not Implemented
SU0144 # 01 Y:2002 01 2002 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $12,159 Not Implemented
SU0144 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $3,865 $181 Implemented
SU0144 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,993 $870 Implemented
SU0144 # 04 Y:2002 04 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,289 $1,344 Not Implemented
SU0144 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $649 $2,150 Not Implemented
SU0144 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $586 $0 Not Implemented
SU0144 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $326 $0 Implemented
SU0144 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $255 $75 Implemented
SU0144 # 09 Y:2002 09 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $252 $40 Not Implemented
SU0141 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,663,245 $4,336,000 Not Implemented
SU0141 # 02 Y:2002 02 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $640,000 $9,000,000 Implemented
SU0141 # 03 Y:2002 03 2002 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $522,000 $4,077,000 Not Implemented
SU0141 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $117,834 $95,000 Implemented
SU0141 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,317 $203,719 Implemented
SU0141 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33,774 $0 Not Implemented
SU0141 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $17,677 $84,000 Not Implemented
SU0141 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,012 $480 Implemented
SU0141 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $2,155 $1,110 Implemented