IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0093 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $431 $24 Implemented
DS0093 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $500 Not Implemented
DS0093 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $76 Implemented
DS0093 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $851 $4,500 Not Implemented
DS0093 # 06 Y:1997 06 1997 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $37,008 $11,176 Implemented
DS0093 # 07 Y:1997 07 1997 $4,020 $1,016 Implemented
UM0087 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,900 $3,198 Not Implemented
UM0087 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,251 $28,450 Not Implemented
UM0087 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $1,692 $1,000 Not Implemented
UM0087 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,159 $450 Not Implemented
UM0087 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $36,636 $22,800 Not Implemented
UM0087 # 06 Y:1997 06 1997 IMPROVE COMBUSTION CONTROL CAPABILITY $1,053 $3,460 Not Implemented
UM0087 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,708 $3,100 Not Implemented
UM0087 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,616 $0 Not Implemented
UM0087 # 09 Y:1997 09 1997 $20,210 $0 Not Implemented
WI0298 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,190 $30,000 Implemented
WI0298 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,867 $1,480 Not Implemented
WI0298 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,444 $120 Implemented
WI0298 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,193 $0 Not Implemented
WI0298 # 05 Y:1997 05 1997 $24,000 $20,000 Implemented
WI0298 # 06 Y:1997 06 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,119 $18,000 Not Implemented
WI0298 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $2,100 $1,000 Not Implemented
WI0298 # 08 Y:1997 08 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $686 $0 Not Implemented
WI0298 # 09 Y:1997 09 1997 $140 $0 Not Implemented
SF0117 # 01 Y:1997 01 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,796 $8,000 Not Implemented