Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0086 # 04 Y:1997 | 04 | 1997 | INSTALL OCCUPANCY SENSORS | $1,024 | $750 | Not Implemented |
BD0086 # 05 Y:1997 | 05 | 1997 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $904 | $750 | Not Implemented |
BD0086 # 06 Y:1997 | 06 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $859 | $2,750 | Not Implemented |
BD0086 # 07 Y:1997 | 07 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $12,554 | $14,000 | Not Implemented |
BD0086 # 08 Y:1997 | 08 | 1997 | USE A RAG RECYCLE SERVICE | $1,404 | $0 | Not Implemented |
BD0086 # 09 Y:1997 | 09 | 1997 | INSTALL EQUIPMENT TO MOVE PRODUCT | $18,750 | $4,000 | Not Implemented |
UM0087 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,900 | $3,198 | Not Implemented |
UM0087 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,251 | $28,450 | Not Implemented |
UM0087 # 03 Y:1997 | 03 | 1997 | INSTALL OCCUPANCY SENSORS | $1,692 | $1,000 | Not Implemented |
UM0087 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,159 | $450 | Not Implemented |
UM0087 # 05 Y:1997 | 05 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $36,636 | $22,800 | Not Implemented |
UM0087 # 06 Y:1997 | 06 | 1997 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,053 | $3,460 | Not Implemented |
UM0087 # 07 Y:1997 | 07 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,708 | $3,100 | Not Implemented |
UM0087 # 08 Y:1997 | 08 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,616 | $0 | Not Implemented |
UM0087 # 09 Y:1997 | 09 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $20,210 | $0 | Not Implemented |
WI0298 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $29,190 | $30,000 | Implemented |
WI0298 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,867 | $1,480 | Not Implemented |
WI0298 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,444 | $120 | Implemented |
WI0298 # 04 Y:1997 | 04 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,193 | $0 | Not Implemented |
WI0298 # 05 Y:1997 | 05 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $24,000 | $20,000 | Implemented |
WI0298 # 06 Y:1997 | 06 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,119 | $18,000 | Not Implemented |
WI0298 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $2,100 | $1,000 | Not Implemented |
WI0298 # 08 Y:1997 | 08 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $686 | $0 | Not Implemented |
WI0298 # 09 Y:1997 | 09 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $140 | $0 | Not Implemented |
SF0117 # 01 Y:1997 | 01 | 1997 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,796 | $8,000 | Not Implemented |