IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0290 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,703 $1,080 Implemented
MI0290 # 12 Y:2016 12 2016 REDUCE HEAT GAIN BY WINDOW TINTING $1,443 $2,240 Not Implemented
MI0290 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,396 $3,240 Not Implemented
MI0290 # 14 Y:2016 14 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $396 $317 Implemented
WV0517 # 01 Y:2016 01 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $22,825 $54,000 Not Implemented
WV0517 # 02 Y:2016 02 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,474 $1,000 Implemented
WV0517 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,320 $0 Implemented
WV0517 # 04 Y:2016 04 2016 DEVELOP A REPAIR/REPLACE POLICY $5,859 $1,478 Implemented
WV0517 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $2,584 $5,000 Not Implemented
WV0517 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,573 $450 Implemented
WV0517 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $1,069 $260 Implemented
WV0517 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $959 $1,940 Not Implemented
WV0517 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $847 $60 Implemented
TT0165 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,510 $75,000 Not Implemented
TT0165 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,405 $88,306 Implemented
TT0165 # 03 Y:2016 03 2016 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,033 $3,600 Implemented
TT0165 # 04 Y:2016 04 2016 OPERATE BOILERS ON HIGH FIRE SETTING $4,000 $12,000 Implemented
TT0165 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,310 $1,919 Implemented
TT0165 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $1,500 Implemented
TT0165 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $200 Implemented
OK0932 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,787 $14,515 Not Implemented
OK0932 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,916 $7,335 Not Implemented
OK0932 # 03 Y:2016 03 2016 USE RADIANT HEATER FOR SPOT HEATING $3,703 $11,940 Not Implemented
OK0932 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,740 $2,829 Not Implemented
OK0932 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $481 $460 Not Implemented