IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0191 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $719 $750 Not Implemented
LE0189 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,147 $0 Not Implemented
LE0189 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,542 $600 Implemented
LE0189 # 03 Y:2004 03 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,151 $6,000 Not Implemented
LE0189 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,301 $575 Not Implemented
LE0189 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $293 $0 Implemented
LE0189 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $0 Not Implemented
LE0189 # 07 Y:2004 07 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,806 $1,193 Not Implemented
LE0190 # 01 Y:2004 01 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $65,403 $20,000 Implemented
LE0190 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,844 $50,000 Not Implemented
LE0190 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,450 $2,500 Not Implemented
LE0190 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,412 $750 Not Implemented
LE0190 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,074 $218 Implemented
LE0190 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,187 $33,512 Implemented
SU0187 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $0 Not Implemented
SU0187 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,502 $350 Implemented
SU0187 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $442 Not Implemented
SU0187 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $26,177 $53,000 Not Implemented
SU0187 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,721 $10,129 Implemented
SU0187 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,206 $3,817 Not Implemented
LE0185 # 01 Y:2004 01 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,836 $43,080 Not Implemented
LE0185 # 02 Y:2004 02 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,144 $35,305 Not Implemented
LE0185 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,386 $6,346 Not Implemented
LE0185 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,153 $9,850 Not Implemented
LE0185 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,720 $6,500 Not Implemented