Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0397 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,147 | $6,757 | Not Implemented |
AS0397 # 04 Y:2005 | 04 | 2005 | REDUCE SCRAP PRODUCTION | $474 | $150 | Not Implemented |
AS0397 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $520 | $250 | Not Implemented |
UD0715 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,797 | $53,464 | Implemented |
UD0715 # 02 Y:2005 | 02 | 2005 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $21,170 | $62,500 | Not Implemented |
UD0715 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,402 | $100 | Implemented |
UD0715 # 04 Y:2005 | 04 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,597 | $500 | Implemented |
UD0715 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,021 | $0 | Implemented |
UD0715 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,689 | $0 | Not Implemented |
UD0715 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $781 | $340 | Implemented |
UD0715 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $130 | Not Implemented |
UD0715 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $531 | $0 | Implemented |
OR0480 # 01 Y:2005 | 01 | 2005 | METER WASTE WATER | $14,400 | $0 | Implemented |
OR0480 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,175 | $3,200 | Implemented |
OR0480 # 03 Y:2005 | 03 | 2005 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $493 | $0 | Implemented |
OR0480 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $1,910 | $2,000 | Not Implemented |
WI0489 # 01 Y:2005 | 01 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $8,655 | $1,600 | Implemented |
WI0489 # 02 Y:2005 | 02 | 2005 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $6,360 | $0 | Implemented |
WI0489 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,677 | $758 | Implemented |
WI0489 # 04 Y:2005 | 04 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,606 | $3,000 | Not Implemented |
WI0489 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,494 | $2,314 | Implemented |
WI0489 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $782 | $0 | Implemented |
WI0489 # 07 Y:2005 | 07 | 2005 | IMPROVE LUBRICATION PRACTICES | $735 | $828 | Not Implemented |
WI0489 # 08 Y:2005 | 08 | 2005 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $815 | $0 | Implemented |
WI0489 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $481 | $100 | Implemented |