IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0397 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,147 $6,757 Not Implemented
AS0397 # 04 Y:2005 04 2005 REDUCE SCRAP PRODUCTION $474 $150 Not Implemented
AS0397 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $520 $250 Not Implemented
UD0715 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,797 $53,464 Implemented
UD0715 # 02 Y:2005 02 2005 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $21,170 $62,500 Not Implemented
UD0715 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,402 $100 Implemented
UD0715 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,597 $500 Implemented
UD0715 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,021 $0 Implemented
UD0715 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,689 $0 Not Implemented
UD0715 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $781 $340 Implemented
UD0715 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $781 $130 Not Implemented
UD0715 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $531 $0 Implemented
OR0480 # 01 Y:2005 01 2005 METER WASTE WATER $14,400 $0 Implemented
OR0480 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $3,200 Implemented
OR0480 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $493 $0 Implemented
OR0480 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $1,910 $2,000 Not Implemented
WI0489 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $8,655 $1,600 Implemented
WI0489 # 02 Y:2005 02 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,360 $0 Implemented
WI0489 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,677 $758 Implemented
WI0489 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,606 $3,000 Not Implemented
WI0489 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,494 $2,314 Implemented
WI0489 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $782 $0 Implemented
WI0489 # 07 Y:2005 07 2005 IMPROVE LUBRICATION PRACTICES $735 $828 Not Implemented
WI0489 # 08 Y:2005 08 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $815 $0 Implemented
WI0489 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $481 $100 Implemented