Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0838 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,070 | $10,152 | Implemented |
AM0838 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,720 | $29,570 | Implemented |
AM0838 # 05 Y:2022 | 05 | 2022 | USE SYNTHETIC LUBRICANT | $1,646 | $300 | Implemented |
AM0838 # 06 Y:2022 | 06 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,835 | $1,420 | Implemented |
AM0838 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,164 | $0 | Implemented |
AS0513 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $90,618 | $28,940 | Not Implemented |
AS0513 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,678 | $302,167 | Not Implemented |
AS0513 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,875 | $580,160 | Not Implemented |
AS0513 # 04 Y:2022 | 04 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $15,767 | $43,000 | Not Implemented |
AS0513 # 05 Y:2022 | 05 | 2022 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $11,700 | $453 | Not Implemented |
AS0513 # 06 Y:2022 | 06 | 2022 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $6,454 | $122 | Not Implemented |
AS0513 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $1,979 | $1,772 | Not Implemented |
AS0513 # 08 Y:2022 | 08 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,143 | $411 | Not Implemented |
UF0571 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $72,351 | $83,616 | Implemented |
UF0571 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $23,651 | $18,000 | Implemented |
UF0571 # 03 Y:2022 | 03 | 2022 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $22,414 | $51,208 | Implemented |
UF0571 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $4,673 | $5,569 | Implemented |
UF0571 # 05 Y:2022 | 05 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $65,277 | $10,000 | Implemented |
UF0571 # 06 Y:2022 | 06 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $8,754 | $0 | Implemented |
OR0749 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $999 | $0 | Implemented |
OR0749 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $43,522 | $28,094 | Not Implemented |
OR0749 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,003 | $11,329 | Implemented |
OR0749 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $122,100 | $1,640,000 | Implemented |
UU0194 # 01 Y:2022 | 01 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $39,902 | $83,130 | Not Implemented |
UU0194 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,721 | $113,682 | Implemented |