IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0084 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $431 $390 Implemented
IA0084 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $6,631 $22,020 Not Implemented
IA0084 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $5,786 $545 Not Implemented
IA0084 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,074 $800 Not Implemented
IA0084 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,758 $250 Implemented
IA0084 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $325 $150 Not Implemented
IA0084 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $193 $516 Not Implemented
GT0526 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,660 $25,050 Implemented
GT0526 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,810 $1,340 Not Implemented
GT0526 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,860 $189,480 Not Implemented
GT0526 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,020 $135,100 Not Implemented
GT0526 # 05 Y:1994 05 1994 INSTALL TIMERS AND/OR THERMOSTATS $10,800 $13,300 Not Implemented
GT0526 # 06 Y:1994 06 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,120 $250 Implemented
GT0526 # 07 Y:1994 07 1994 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $189,570 $279,700 Not Implemented
GT0525 # 01 Y:1994 01 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,630 $5,000 Not Implemented
GT0525 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,470 $6,520 Implemented
GT0525 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,860 $1,150 Implemented
GT0525 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,170 $32,530 Implemented
GT0525 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,600 $2,550 Not Implemented
GT0525 # 06 Y:1994 06 1994 COVER OPEN TANKS $2,280 $740 Not Implemented
BD0005 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,475 $22,315 Implemented
BD0005 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,194 $4,456 Implemented
BD0005 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $1,322 $150 Implemented
BD0005 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,870 $3,200 Implemented
BD0005 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,894 $1,000 Implemented