IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0080 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,046 $0 Implemented
IC0080 # 04 Y:2004 04 2004 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $40,931 $95,360 Implemented
IC0080 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,354 $2,640 Implemented
IC0080 # 06 Y:2004 06 2004 USE OPTIMUM TEMPERATURE $24,757 $53,496 Not Implemented
IC0080 # 07 Y:2004 07 2004 USE OPTIMUM TEMPERATURE $62,610 $35,948 Implemented
IC0080 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $377 $1,384 Not Implemented
IC0080 # 09 Y:2004 09 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,154 $10,967 Not Implemented
IC0080 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,008 $11,878 Not Implemented
IC0080 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $413 $1,540 Implemented
IC0080 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $787 $896 Implemented
IC0080 # 13 Y:2004 13 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $49 Implemented
IC0080 # 14 Y:2004 14 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $258 $0 Implemented
UF0340 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $122,549 $170,000 Not Implemented
UF0340 # 02 Y:2004 02 2004 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $617,545 $2,420,000 Not Implemented
UF0340 # 03 Y:2004 03 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $29,744 $98,000 Not Implemented
UF0340 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,590 $48,289 Implemented
UF0340 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $10,480 $40,000 Implemented
UF0340 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,682 $400 Implemented
UF0340 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,109 $37,572 Not Implemented
UF0340 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,678 $7,900 Implemented
MS0249 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $54,067 $26,100 Implemented
MS0249 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $19,536 $250 Implemented
MS0249 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $12,086 $1,814 Not Implemented
MS0249 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,838 $14,639 Not Implemented
MS0249 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,879 $708 Implemented