Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0311 # 12 Y:2005 | 12 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $480 | $158 | Implemented |
WV0310 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,059 | $8,260 | Not Implemented |
WV0310 # 02 Y:2005 | 02 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,573 | $8,352 | Not Implemented |
WV0310 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,268 | $0 | Not Implemented |
WV0310 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,968 | $11,900 | Not Implemented |
WV0310 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $2,190 | $820 | Not Implemented |
WV0310 # 06 Y:2005 | 06 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,229 | $304 | Not Implemented |
WV0310 # 07 Y:2005 | 07 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,763 | $336 | Not Implemented |
WV0310 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,536 | $870 | Not Implemented |
WV0310 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $951 | $238 | Not Implemented |
WV0310 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $943 | $24 | Not Implemented |
WV0310 # 11 Y:2005 | 11 | 2005 | INSTALL OCCUPANCY SENSORS | $921 | $2,268 | Not Implemented |
WV0310 # 12 Y:2005 | 12 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $560 | $145 | Not Implemented |
WV0310 # 13 Y:2005 | 13 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $539 | $132 | Not Implemented |
GT0799 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,890 | $450 | Not Implemented |
GT0799 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,582 | $3,682 | Implemented |
GT0799 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,040 | $280,000 | Not Implemented |
GT0799 # 04 Y:2005 | 04 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,608 | $12,000 | Not Implemented |
GT0799 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,409 | $260,000 | Not Implemented |
GT0799 # 06 Y:2005 | 06 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,500 | $60,000 | Implemented |
LL0219 # 01 Y:2005 | 01 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $49,904 | $26,850 | Implemented |
LL0219 # 02 Y:2005 | 02 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $38,931 | $18,717 | Implemented |
LL0219 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,345 | $4,495 | Not Implemented |
LL0219 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,142 | $60 | Implemented |
LL0219 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,865 | $3,360 | Implemented |