IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0415 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $21,876 $30,800 Not Implemented
WV0415 # 03 Y:2010 03 2010 REDUCE VENTILATION AIR $18,153 $5,000 Not Implemented
WV0415 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,296 $7,820 Implemented
WV0415 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $12,353 $34,050 Not Implemented
WV0415 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,767 $1,503 Implemented
WV0415 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,621 $2,000 Implemented
WV0415 # 08 Y:2010 08 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,733 $700 Implemented
WV0415 # 09 Y:2010 09 2010 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,603 $5,265 Not Implemented
WV0415 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,852 $884 Implemented
WV0415 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,398 $4,490 Implemented
WV0415 # 12 Y:2010 12 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,032 $1,312 Implemented
UD0825 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,398 $100 Not Implemented
UD0825 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,976 $2,000 Not Implemented
UD0825 # 03 Y:2010 03 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,869 $10,000 Not Implemented
UD0825 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,525 $100 Not Implemented
UD0825 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,681 $25 Not Implemented
UD0825 # 06 Y:2010 06 2010 AVOID REWINDING MOTORS MORE THAN TWICE $783 $971 Not Implemented
UD0825 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $268 $75 Not Implemented
UD0825 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $60 Not Implemented
UD0825 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,851 $13,500 Not Implemented
UD0825 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $5,151 $1,200 Not Implemented
UD0824 # 01 Y:2010 01 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $48,864 $143,000 Not Implemented
UD0824 # 02 Y:2010 02 2010 INSTALL WIND POWERED ELECTRIC GENERATOR $1,443,350 $3,000,000 Not Implemented
UD0824 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,706 $15,238 Not Implemented
UD0824 # 04 Y:2010 04 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,478 $10,195 Not Implemented